The Ministry of Transport, through the Ghana Railway Development Authority (GRDA), has formally invited local and international investors to submit Expressions of Interest (EoI) for the development of the 1,262-kilometre standard-gauge Central Railway Corridor.
According to an official release from the Authority, the mega-infrastructure project, classified under Lot 2 of the Ghana Railway Master Plan 2026, will be executed under a Public-Private Partnership (PPP) arrangement.
Specifically, the procurement will follow a Finance, Design, Build, Equip, Operate, and Transfer (F-DBEOT) concession model, with project finance proposals set to be evaluated separately.
The proposed standard-gauge line will stretch from Tema Port through Accra to the Boankra Inland Port and Kumasi, before extending onward into Northern Ghana. In a historic first for the country’s transport infrastructure, the new Accra–Kumasi Expressway project offers a strategic opportunity to secure a dedicated railway Right of Way (RoW) along the route.
Dr. Frederick Appo, Chief Executive Officer of GRDA noted that the Central Corridor is a key component of the broader “Rail to Resources” interconnectivity blueprint designed to link Ghana’s major ports, mineral belts, and cocoa-growing regions.
Once completed, the line is expected to accelerate industrial growth, streamline inland freight distribution, ease heavy vehicular congestion on major highways, and bolster cross-border regional trade.
Prospective investors and consortiums have until 4:00 p.m. on January 31, 2027, to submit their applications.
Submissions can be forwarded electronically to the Authority via procurement@grda.gov.gh or prince.nsiah-asamoah@grda.gov.gh, while signed hard copies must be delivered to the Director of Procurement at the GRDA head office in Accra.
By: Rainbowradioonline.com/Ghana
