The Member of Parliament for Upper West Akim, Emmanuel Drah, has expressed strong dissatisfaction with the District Chief Executive (DCE) for the area, Rebecca Chissah, over her decision to re-award the contract for the collapsed Adeiso–Oku River bridge to a different contractor.
According to the legislator, he and President John Dramani Mahama had already secured and awarded the contract for the construction of a 120-metre concrete bridge, alongside dredging works, to an existing contractor who is currently on site executing the project.
Speaking in an interview on Nyankonton Mu Nsem on Rainbow Radio 87.5FM, Mr Drah noted that the incident underscores the importance of close collaboration between legislators and local government heads to prevent administrative clashes.
“This is precisely why MPs are often advised to work closely with their Metropolitan, Municipal and District Chief Executives, so that such misunderstandings and misconduct do not occur,” he stated.
Mr Drah said he was deeply disappointed by the DCE’s unilateral action, stressing that the decision was taken without any prior communication or consultation with his office.
The MP has consequently demanded the immediate cancellation of the second contract, describing the move as completely unnecessary, wasteful, and a recipe for confusion on the ground.
“Awarding the exact same project to two different contractors is not only wasteful, but it will also create needless confusion,” Mr Drah argued. “If there was any genuine need to engage a second contractor, proper consultation should have been carried out first among all relevant stakeholders before any such decision was taken.”
By: Rainbowradioonline.com/Ghana















